Upload your 30-minute usage data — or let us fetch it for you with a one-page Letter of Authority. In under a minute we show the savings that are pure physics: the capacity you're renting but never use, the peak windows you're paying premium for, the overnight load nobody scheduled. No consultants, no waiting, no guesswork.
Run a free audit → No data file? We'll fetch it →Most Irish businesses can't locate their 30-minute interval export. That's fine — that's our job. Give us your meter number (MPRN) and supplier, and we generate a Letter of Authority (LoA) that lets us request your interval data directly from your supplier's data-release desk.
Demo Business — generated from 5,760 interval readings over 119 days. Confidential.
| Metric | Value |
|---|---|
| Annualized consumption | 303,295 kWh |
| Est. annual cost | €91,317 |
| Peak demand | 120.0 kW @ 2026-01-10 17:00:00 |
| Overnight baseload | 15.9 kW |
| Load factor | 0.29 |
| Night share / weekend share | 0.13 / 0.28 |
| Finding | Detail | €/yr |
|---|---|---|
| Overnight baseload | Your facility draws ~16 kW continuously (all-night floor). If 15% of that is scheduling waste (HVAC, lighting, servers): ~EUR 6,276/yr. | €6,276 |
| Recurring peak demand | Peak demand recurs around Thu 18:00 (3x in top-10 peaks). Shifting deferrable load off 17:00-19:00 into 02:00-05:00 saves ~EUR 19,614/yr at day/night rates. | €19,614 |
| Contracted capacity (MIC) | Load factor is 29% — peaking 120 kW with low sustained use. If your MIC exceeds ~126 kVA you are over-contracted. Reducing to 126 kVA saves ~EUR 228/yr on capacity charges. | €228 |
| Total identified | €26,117 | |
Dear Energia Accounts,
Re: MPRN 10000000000 — request to reduce Maximum Import Capacity to 126 kVA, effective next billing period. Interval analysis shows measured peak 120 kW, well within the proposed MIC. Please confirm in writing.
Demo Business
Figures are modelled estimates from interval data; verify before contract action. Pylon is not a licensed energy supplier.
Full report ready — print or save as PDF. Paid tier unlocks the tender pack + supplier negotiation letter.